Broad Reach Construction
Field Safety Binder Template
Field Safety Binder
Broad Reach Construction
Purpose:
The purpose of this binder is to outline Broad Reach Construction’s commitment to safety. Included in this binder are the principles and requirements for each project site we work on. Please keep this binder on the project site when possible or within your reach in the event you need to refer to it.
Thank you for your dedication to a safe workplace,
Sincerely,
Kevin W. Morgan
CEO/Owner
Broad Reach Construction
Project Assignment
Table of Contents & Checklist
Superintendents: Please review the following outline and ensure all information and physical documents are present at the site.
-
Section 1: Site Specific Emergency Numbers, Addresses, and Contacts.
-
Section 2: BRC Important Phone Numbers (Customer CM, All Subs, and Partners).
-
Section 3: Site Safety Plan, JHA, AED Location, PPE, Site Rules (Signed).
-
Section 4: Superintendent's OSHA Certificate/Credentials.
-
Section 5: BRC Inc. State License.
-
Section 6: Project Permit(s).
-
Section 7: State and Federal OSHA / Workers Rights Poster (State Specific).
-
Physical Requirement: Plans for all work are on site (Stored in a 4” tube).
Site Specific Emergency Information
Site Location Address
Provide the exact address to give to 911 dispatchers.
Emergency Contacts
Nearest Hospital & Clinic
Important Project Contacts
Broad Reach Construction (BRC)
Customer / Construction Manager (CM)
Subcontractors & Partners
Site Safety Plan & Requirements
Required Personal Protective Equipment (PPE)
Site Specific Rules & Job Hazard Analysis (JHA) Notes
I certify that the site specific safety plan has been established and reviewed.
Required Documents
Please physically insert copies of the following documents immediately behind this page in the binder:
1. Superintendent's OSHA Certificate
(Insert Copy Behind)
2. BRC Inc. State License
(Insert Copy Behind)
3. Project Permit(s)
(Insert Copy Behind)
4. State & Federal OSHA Posters
(Insert Copies Behind - Ensure they are State Specific)
Reminder: Physical plans for all work must be kept on site in a 4" tube.